Duke Energy | Mount Holly Classroom Renovation

Michelle Smith

Interior renovation of an existing building to provide training and classroom spaces. The scope included demolition, new ceiling, lighting, flooring, walls, restrooms, finishes, and furniture. The project also included the complete demolition of an existing Admin Building and site work, hardscapes, and landscaping.

Corporate Center | WFUCC 5th Floor Space Modernization

info@foureyes.com

An 88,000 sf floor renovation including demolition and new construction plans promoting workplace strategy and concepts by creating collaboration amongst associates. The goal of this project was to create a more efficient and open space while enhancing the natural light and acoustics of the floor. A café was constructed in addition to all-new interior floors, walls, ceilings, millwork, workstations, and …

Retail Bank Renovation | Highway 73

Michelle Smith

Construction of a 3,500 SF interior fit-out banking center. The space included teller work stations, lobby, private offices, cash vaults, ATMs, and drive-thru teller lanes. The scope of work included mechanical, electrical, plumbing, telecommunication, and security installations, interior finishes, ceiling, walls and flooring, AV and bank equipment, and signage.

Virginia Tech | Corps Leadership & Military Science Building

Michelle Smith

The project includes the demolition of the existing Art Design Learning Center and new construction of a three-story Corps Leadership & Military Science Building to house the Corps of Cadets administrative staff, Rice Center for Leadership Development, Military Science staff, a museum, classrooms, ISERC cyber security, and a three-story atrium.  The exterior features will include the classic Hokie Stone that …

Virginia Tech University | Upper Quad North

Michelle Smith

McFarland Construction, in association with Vannoy Construction, is completing the demolition of the existing Femoyer Hall and construction of a new, 56,650 sf, five-story Upper Quad North Residence Hall. This building will include 301 student beds for the Corps of Cadets, faculty/staff living spaces, company meeting rooms, floor lounges, a group kitchen, regimental offices, storage spaces to accommodate uniforms/training equipment, …

Atrium Health | MSK Ortho Trauma

Michelle Smith

Completion of a three-phased interior renovation of an existing, occupied medical office building. The scope of work included demolition, new flooring, paint, finishes, millwork, modified wall systems, new door assemblies, unistrut support and lead-lined windows for an x-ray machine and x-ray room, and modifications to the existing MEP systems including fire sprinkler and alarm.

Fifth Third Bank | Ridgewood

Michelle Smith

Interior renovation of an existing 1,770 sf building and exterior modifications. The new retail branch is part of Fifth Third’s North Carolina expansion. Their next-generation space design focuses on collaborative environments and digital capabilities. The banking center includes a lobby, collaborative meeting space, semi-private offices, teller station, cash vaults, ATMs, and drive-thru teller lanes.

Duke Energy | 39th & 40th Floor Renovation

Michelle Smith

Interior renovations of corporate offices located in the Duke Energy Center. The project included demolition and new construction plans to promote workplace strategy and concepts by creating collaboration amongst associates. The goal of this project was to create a more efficient space. The office space included several collaborative working areas, break-out rooms, and conference rooms.

Duke Energy | Fairfax Mobile Transmission

Michelle Smith

Ground-up construction of pre-engineered metal storage building to include site work, utility work, and interior buildout. The building included rollup doors and installation of steel pole racks.

Charlotte Housing Authority | The Landing at Park Road

Michelle Smith

New construction of a 92-unit, 63,000 sf apartment building for low-income senior citizens. This project included all aspects involved with new construction – clearing, grading, underground utilities, storm drainage, curb and gutter, sub-grade prep for parking and drives, mechanical, electrical, plumbing, structural concrete, interior framing, drywall, painting, doors/frames, and exterior landscaping. This project earned 20% MWBE and 14% HUD Section …

Charlotte Housing Authority | Parktowne Terrace

Michelle Smith

McFarland provided CM services on this 110,000 SF, 163-unit, 6-story senior living facility. Accomplishing LEED Gold Certification, this project entailed a complete rehab to all interior finishes, a new reflective roof, extensive elevator upgrades, electrical switch, generator, and power distribution. Additional work entailed the construction of a single-story addition to the rear of the building, and a 3-story addition to …

CMS | Berryhill / Reid Park K-8 Relief School

info@foureyes.com

New construction of a 136,394 sf pre-K through 8th-grade school situated on 25 acres of land in southwest Charlotte. The building is 3-stories and includes 54 classrooms to accommodate 550+ students and staff. The scope included a science lab, art classrooms, a multi-purpose room, and a gymnasium. Additionally, we constructed several outdoor play areas and soccer fields.