PROJECTS

A COMMITMENT TO EXCELLENCE

With operations spanning the Mid-Atlantic region, McFarland Construction has the team, expertise and resources to ensure our clients receive personal and comprehensive service. Our engagements are all built on the foundation of Community – Commitment – Collaboration, and we take great pride in bridging relationships between the client, stakeholders, design professionals and trade contractors, driving predictable and positive project outcomes.


COMMERCIAL

Transamerica 7, 8 & 9 Refresh | Charlotte, NC

As GC on this the multi-floor refresh and renovation project, McFarland was responsible for creating new break room space, and providing uninterrupted power throughout the building. Additional activities consisted of doors/frames/hardware, drywall, acoustical ceilings, painting, plumbing and electrical upgrades.

Wells Fargo 25th Floor | Charlotte, NC

McFarland provided GC services on this 22,000 SF renovation project which entailed a demolition of existing offices, to create an open floor plate for the installation of multiple work stations. Further, we renovated and upgraded the restrooms to meet ADA requirements.

EDUCATION

CPCC 3rd-floor ATC Refresh | Charlotte, NC

The refresh to the 3rd floor, 6,500 SF simulation lab entailed updating finishes, and fire alarm and security devices. In addition, new air valve and drops were installed to support simulation equipment in this fully occupied and functioning computer/simulation lab.

CPCC Claytor Building | Charlotte, NC

As GC on this fast-paced conversion of a testing lab into administrative office space, McFarland was responsible for demolition, interior construction, ADA upgrades, mechanical and electrical scopes of work. Crews worked around the clock ensuring all construction, inspection and punch-list items were ready for the end user.

FEDERAL / MILITARY

Drill Sergeants Barracks | Fort Jackson, SC

Coordinated, furnished and installed the wet pipe fire sprinkler system for this 136,000 SF, 3-story, Leed Silver, design-build project.

St. Stephens Power Plant | St. Stephens, SC

Project entailed the design-build of three access platforms used to support maintenance of thrust housing assemblies and turbines for hydro-electric power.

MULTI-FAMILY

Parktowne Terrace | Charlotte, NC

McFarland provided CM services on this 110,000 SF, 163-unit, 6-story senior living facility. Accomplishing LEED Gold Certification, this project entailed a complete rehab to all interior finishes, a new reflective roof, extensive elevator upgrades, a new electrical switch, generator and power distribution. Additional work entailed construction of a single story addition to the rear of the building, and a 3-story addition to the front entrance.

Park & Marsh | Charlotte, NC

Clearing, grading, underground utilities, storm drainage, curb and gutter, sub-grade prep for parking and drives, mechanical, electrical, plumbing, structural concrete, interior framing, drywall, painting and exterior landscaping, and installation of balconies, garden plots and fitness center.

RENEWABLE ENERGY

25MW Solar Farm | New Mexico

Our team provided QA/QC support on this 25MW, 500 acre, Photovoltaic solar farm project. The project was constructed to include a single axis tracking system and communication infrastructure, and included fencing, site/grading, combiner boxes, inverter stations, and module, racking, piles gear boxes and motors.

5MW Solar Farm | North Carolina

Our team provided QA/QC support on this 5MW, 30 acre, Photovoltaic solar farm project. The project was constructed to include a single axis tracking system and communication infrastructure, and included fencing, site/grading, combiner boxes, inverter stations, and module, racking, piles gear boxes and motors.

TRANSPORTATION

Indianapolis Airport | Indianapolis, IN

Tino McFarland provided onsite pre-construction planning for the landside support facilities, access roads and earthwork associated with this comprehensive airport redevelopment project.

CATS Blue Line Extension | Charlotte, NC

As a sub-consultant to HNTB, McFarland provided project controls and inspection support to assist with the extension of the Blue Line from Uptown Charlotte to UNC Charlotte.